M&D
Meridian & Draft — Architecture & Construction
DWG NO. MD-016
REV D · SHEET 1 OF 1
architecture & construction, one studio — from first survey to final handover.

MERIDIAN &DRAFT

STUDIO OF RECORD — EST. 2009, O/A
CAP HT. × 2 LINES

SCOPE OF WORK — RESIDENTIAL, CIVIC & ADAPTIVE REUSE, DRAWN THROUGH PLANNING AND BUILT TO HANDOVER.

SCROLL FOR SHEET DETAILS▼
ORIENTATION N
SCALE — METRES 0 50 100
Approvedfor issue · 2026

SHEET DETAIL / FEATURED PROJECT / EXPLODED CONSTRUCTION VIEW

FIG. 1 — THE KILN WORKS

10 12 14 16 18

FIG. 1 — THE KILN WORKS, EXPLODED VIEW · SCALE 1:50 · DO NOT SCALE

Approvedplan check · M&D

SPECIFICATION

ADAPTIVE REUSE OF A 1908 BRICK KILN HALL. RETAINED MASONRY SHELL, NEW STEEL FRAME & CLT FLOOR PLATES — TWELVE WORKSPACES AND A CIVIC HALL, ZERO DEMOLITION.

note to plan-checker: the original trusses held — every one retained, re-rated and back in service.

Parts List — DWG MD-016 / FIG. 1
10Masonry ShellRetained 1908 brick
12Fenestration GridSteel-framed glazing
14Services CorePlant, risers, lift
16Structural TiesNew steel frame, pinned
18Floor PlatesCLT, exposed soffits
20DemolitionDELETED — ZERO REQ'D
Request the project sheet →

SHEET DETAILS / BUILT WORKS / ELEVATION DRAWINGS

FIGS. 2–4 — ON THE BOARD

Approved
roofline follows the tide wall
FIG. 2 — FRONT ELEVATION

Harbour Light House

Coastal new-build residence — timber frame, zinc roof

SCALE: 1:100 · STATUS: HANDED OVER
Approved
nine bays, one brick module
FIG. 3 — FRONT ELEVATION

Ropewalk Terraces

Nine-unit infill terrace — brick, on a single grid

SCALE: 1:100 · STATUS: ON SITE, PHASE 2
Approved
footfall up since reopening
FIG. 4 — FRONT ELEVATION

Granary Market Hall

Grade-II granary restored as a covered market

SCALE: 1:100 · STATUS: OPEN TO PUBLIC

RECORD SET / SITE PHASES / READ BOTTOM-UP IF YOU'RE OLD-SCHOOL

THE PHASES, AS REVISIONS

REV 0feasibility & measured survey — walk the site, fix the datum, agree the brief.superseded
REV Aconcept design issued — massing, orientation and the first pencil elevations.signed off
REV Bplanning set issued — drawings, heritage statement and consultations lodged.consented
REV Ctechnical design issued — details, materials schedule and tender package.tendered
REV Dissued for construction — site phases sequenced, first concrete poured.current · 2026

TYP. ALL SHEETS / ABOUT THE STUDIO

GENERAL NOTES

Approvedno exceptions taken
  1. N-01

    the studio of record is Meridian & Draft — architects and builders under one roof, drawing board to site hut.

  2. N-02

    scope covers residential, civic and adaptive reuse. nothing decorative; everything load-bearing.

  3. N-03

    all dimensions are in millimetres unless noted otherwise. tolerance: ±5mm, tighter at the joinery bench.

  4. N-04

    drawings on this sheet are not concepts — every figure shown has been built.

  5. N-05

    do not scale this drawing. build it.

TENDER PACKAGE / COMMISSIONS OPEN / ASSEMBLY DRAWING

ASSY. A — WORK WITH US

ONE BUILD A1 A2 A3

ASSY. A — THREE TRADES, ONE STUDIO · ASSEMBLES ON SCROLL

Bid opencommissions · 2026

SCHEDULE OF SERVICES

three trades on one board — pick a part, or commission the whole assembly.

Bid Items — DWG MD-016 / ASSY. A
A1

Architecture & Planning

CONCEPT TO CONSENT — SURVEYS, PLANNING SETS AND HERITAGE STATEMENTS, DRAWN LIKE THIS VERY SHEET.

A2

Construction Delivery

MAIN-CONTRACTOR WORKS — SITE PHASES SEQUENCED, ISSUED FOR CONSTRUCTION, BUILT TO HANDOVER.

A3

Materials & Detailing

MATERIALS SCHEDULES, JOINERY, FACADE DETAILS — SPECIFIED FOR WEATHER, RATED FOR LOAD.

Request a quote →

METHOD OF WORKS / FOUR PASSES, EVERY PROJECT / PATENT DRAWINGS

FIGS. 5–8 — THE PROCESS

FULL SCOPE
FIG. 5 — PASS 01

Discover

SCOPE THE GOAL — WALK THE SITE, TAKE FIELD NOTES, FIX THE BRIEF.

DELIVERABLE: BRIEF, AGREED SCOPE
R = MOTION
FIG. 6 — PASS 02

Design

DIRECTION + MOTION LANGUAGE — LINEWORK SET BEFORE INK GOES DOWN.

DELIVERABLE: DIRECTION + MOTION SPEC
TOL ±5MM SET OUT · CHECKED
FIG. 7 — PASS 03

Build

SET OUT, CHECKED — EVERY MEMBER LOAD-BEARING, NOTHING DECORATIVE.

DELIVERABLE: PHASED WORKS, CLEAN SNAG LIST
HANDOVER → OCCUPY
FIG. 8 — PASS 04

Handover

KEYS, O&M MANUALS, AS-BUILT SET — REVISITED AT TWELVE MONTHS.

DELIVERABLE: OCCUPIED, WARRANTED, REV'D

QUANTITY TAKEOFF / MEASURED FROM THE RECORD SET / DO NOT SCALE

TAKEOFF — BY THE NUMBERS

measured twice, built once — quantities as built, not as promised.

M-01
6SITES ACTIVE THIS YEAR
M-02
1LISTED KILN HALL SAVED
M-03
26PLANNING CONSENTS SECURED
M-04
100%ON-TIME HANDOVERS

CORRESPONDENCE / MARKUPS WELCOME

RFI — REQUEST FOR INFO

got a site, a shell, or a sketch on a napkin? send a markup — red pen encouraged.

DIRECT LINE —
hello@meridiandraft.example

ReceivedRFI logged · M&D